Construction time: August 2016
Problem: Root ingrowth
As a preventive measure, the main pipeline (PP sewer pipe according to DIN EN 14758 ) in the dimensions DN 200 and DN 250 as well as the house connection pipes were equipped with the IP-Plus welding system.
This results in a durable, fully welded solution for wastewater discharge
Client: Wasserverband Vorsfelde
Executing company: Fa. Pasemann
Volume of welded piping:
400 m DN 150 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts
320 m DN 150 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts
75 m DN 250 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts