Construction time: August 2016

Problem: Root ingrowth

As a preventive measure, the main pipeline (PP sewer pipe according to DIN EN 14758 ) in the dimensions DN 200 and DN 250 as well as the house connection pipes were equipped with the IP-Plus welding system.

This results in a durable, fully welded solution for wastewater discharge

Client: Wasserverband Vorsfelde

Executing company: Fa. Pasemann

Volume of welded piping:

400 m DN 150 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts

320 m DN 150 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts

75 m DN 250 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts