83646 Wackersberg
Construction time: June. 2019
Handover DN 500 stable building to the Slurry pit. Execution according to the new AwSV 2017 and the DWA- TRwS 792 for substances hazardous to water.
Requirements:
- Tensile-welded connection
- Traffic load: SLW 60
- High chemical resistance
Special circumstances:
Extreme precipitation during the construction time
Project Scope:
Welding of 14 pieces Connections DN 500