21787 Oberndorf
Construction time: November 2014

Problem: Protection of drinking water

According to the lower water authority of the district, the entire water drainage of the farm’s usable areas had to be carried out by means of welded sewer pipes.
The farm is located in a drinking water protection area.

Client: City of Oberndorf
Execution company: Sentker, Großwörden

Volume:
400 m DN 150 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts
80 m DN 200 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts