10118 Berlin
Construction time: Jun 2017
Problem: Temperature resistance 90°C
The foundation pipe was welded due to thermal and chemical stress.
Volume:
370 m DN 110 PP sewer pipe in accordance with DIN EN 14758 incl. Molded parts
120 m DN 150 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts