Waste water connecting pipe DN 500
76889 Steinfeld Construction time: June 2018 Welding of a sewage connection pipeline in the agricultural area DN 500
76889 Steinfeld Construction time: June 2018 Welding of a sewage connection pipeline in the agricultural area DN 500
Project name: Hydraulic relief of the village Düren – Echtz Reservoir sewer made of PEHD DN 1100, L = 483 m, V = approx. 450 m³ Due to an increase in the volume of wastewater, it became necessary to extend the storm sewer within the town of Düren Echtz from DN 300 to DN 450.…
14487 Bremen Construction time: Jun. 2018 Problem: Temperature resistance 90°C The restoration of the Union Brewery in Bremen required the use of highly thermally and chemically resistant pipes. The IP-plus welding system was used to ensure the permanently safe drainage of the wastewater. Client: Hansewasser Bremen Execution company: Wallrabe und Budelmann, Bremen Volume: 200 m…
84556 Kastl Construction time: May 2018 Welding of a DN 400 slurry connection pipe to the KG 2000 pipe system. Project Scope: IP-plus welding rings DN 400
Since January of this year, the network company of Osnabrücker Stadtwerke AG, as SWO-Netz GmbH, has been renewing the wastewater and stormwater sewers in Scharnhorststraße. The old pipelines date back to 1915 and were correspondingly deteriorated. Furthermore, the dimension of the storm sewer was no longer sufficient for a planned change of the gradient in…
24103 Kiel Construction time: Jan. 2018 Problem solution: High temperature resistance and tightness against concrete pressure during foundation construction. Temperatures in winter to -7°C Project Scope: 450 m DN 110 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts 110 m DN 160 PP sewer pipe acc. to DIN EN 14758 incl. Molded…
78234 Engen Construction time: January 2018 Design, construction for drainage of a highly loaded wastewater system. Project Scope: 1 JGS tank 15 m³ DN 1600 Double pipe system DN 160/200 Incl. Leakage monitoring and control cabinet
47443 Moers Construction time: November 2017 Design, construction for drainage – new construction of a driving silo plant Project Scope: 1 JGS tank 15 m³ DN 1600 1 sedimentation plant DN 1000 100 pieces IP-plus welding rings DN 200 and DN 150 8 separation shafts DN 4400/160
36456 Barchfeld in Thüringen Construction time: November 2017 New construction of a driving silo plant Project Scope: 100 pieces IP-plus welding rings DN 200 and DN 150
47669 Wachtendonk Construction time: September 2017 Design, construction for drainage – new construction of a driving silo plant Project Scope: 1 JGS tank 45 m³ DN 2200, 13.00 m 120 pieces IP-plus welding rings DN 250, DN 200 and DN 150 8 separation shafts DN 400/160