Double pipeline for the drainage of highly loaded wastewater
78234 Engen Construction time: January 2018 Design, construction for drainage of a highly loaded wastewater system. Project Scope: 1 JGS tank 15 m³ DN 1600 Double pipe system DN 160/200 Incl. Leakage monitoring and control cabinet