Construction time: September 2015
Problem: chemical resistance to leachate
According to the client’s requirements, all bearing plates had to be drained by means of welded sewer pipe systems. Welding with the IP-plus welding system results in a durable, fully welded solution for wastewater discharge
Client: LAZBW Grassland
Executing company: Härle Hoch- und Tiefbau, Maselheim
Volume of welded piping:
450 m – IP-plus welded joints DN 160
330 m – IP-plus welded joints DN 200
55 m – IP-plus welded joints DN 250