Builder:
Spedition Dinges International
Max-Planck-Str. 5
67269 Grünstadt
Planning office:
IB-CON GmbH
Mies-van-der-Rohe-Straße 2
14469 Potsdam
Due to the possibility of storing water-polluting substances in a hazardous materials storage facility
foundation and surface drainage had to be carried out in accordance with the strict requirements of the
AwSV.
The responsible authorities demanded a complete welding of the pipelines DN 160 to
DN 315 with a direct welded connection to the inlet gutters and rainwater-
Treatment systems (settling plants and oil separators).
The choice fell on the channel system and treatment plants of the company ACO, which has a
direct connection to the KG 2000 pipe system of the company Ostendorf.
The welding of all components was carried out using the IP-plus welding system from the company SABUG GmbH
.
The welding of all components was carried out using the IP-plus welding system from the company.
parts can be used, which is not least due to the complete KG 2000 program.
pipe system could be kept within reasonable cost limits.
The ease of use and short assembly times of the IP-plus welding system
enabled the civil engineering company to complete this construction project professionally in record time
.