24855 Bollingstedt
Construction time: Mar. 2015

Problem: chemical resistance
According to the administrative specifications, an asphalt storage area had to be equipped with a welded sewer pipe system. This area is located in a drinking water protection area.

Executing company: Jönsbau, Drelsdorf

Volume:
240 m DN 150 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts
185 m DN 200 PP sewer pipe acc. to DIN EN 14758 incl. Formteile
120 m DN 250 PP sewer pipe in accordance with DIN EN 14758 incl. Formteile
17 Road inlets Fa. ACO