14487 Bremen
Construction time: Jun. 2018
Problem: Temperature resistance 90°C
The restoration of the Union Brewery in Bremen required the use of highly thermally and chemically resistant pipes.
The IP-plus welding system was used to ensure the permanently safe drainage of the wastewater.
Client: Hansewasser Bremen
Execution company: Wallrabe und Budelmann, Bremen
Volume:
200 m DN 110 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts
100 m DN 150 PP sewer pipe acc. to DIN EN 14758 incl. Molded parts