Drainage of an asphalt storage area
24855 Bollingstedt Construction time: Mar. 2015 Problem: chemical resistance According to the administrative specifications, an asphalt storage area had to be equipped with a welded sewer pipe system. This area is located in a drinking water protection area. Executing company: Jönsbau, Drelsdorf Volume: 240 m DN 150 PP sewer pipe acc. to DIN EN 14758…