Construction of surface and foundation drainage of a hazardous materials storage facility in accordance with AwSV

Builder: Spedition Dinges InternationalMax-Planck-Str. 567269 Grünstadt Planning office: IB-CON GmbHMies-van-der-Rohe-Straße 214469 Potsdam Due to the possibility of storing water-polluting substances in a hazardous materials storage facilityfoundation and surface drainage had to be carried out in accordance with the strict requirements of theAwSV.The responsible authorities demanded a complete welding of the pipelines DN 160 toDN 315…

Container solutions for leachate treatment

37115 Göttingen- Duderstadt Construction time: Sep. 2019 Development, construction and Design of a container solution for the storage of water pollutants waste water. Design of the tanks double-walled with electronic Leak monitoring, Requirement: SLW 60 Buoyancy control Double-walled High chemical resistance Project Scope: 1 x storage tank 100m³ 1 x storage tank 20 m3 Incl.…

DN 500 transfer line for substances hazardous to water

83646 Wackersberg Construction time: June. 2019 Handover DN 500 stable building to the Slurry pit. Execution according to the new AwSV 2017 and the DWA- TRwS 792 for substances hazardous to water. Requirements: Tensile-welded connection Traffic load: SLW 60 High chemical resistance Special circumstances: Extreme precipitation during the construction time Project Scope: Welding of 14…