Stables

Stables Stables are designed for different animal husbandry and requirements. What they all have in common, however, is the need for defined drainage in accordance with the Water Resources Act (WHG) § 62. As a result, DWA-A 792 (TRwS 792) must be taken into account with regard to wastewater technology. This regulation requires, among other…

Filling areas

Filling areas All areas and sites where liquid manure, leachate or other liquids hazardous to water are removed or transferred must be equipped with a removal point in accordance with DWA-A 792 (TRwS 792). This must be such that the leaking water-polluting substances can run back into the respective container or a pre-pit. All drainage…

Construction of surface and foundation drainage of a hazardous materials storage facility in accordance with AwSV

Builder: Spedition Dinges InternationalMax-Planck-Str. 567269 Grünstadt Planning office: IB-CON GmbHMies-van-der-Rohe-Straße 214469 Potsdam Due to the possibility of storing water-polluting substances in a hazardous materials storage facilityfoundation and surface drainage had to be carried out in accordance with the strict requirements of theAwSV.The responsible authorities demanded a complete welding of the pipelines DN 160 toDN 315…

Container solutions for leachate treatment

37115 Göttingen- Duderstadt Construction time: Sep. 2019 Development, construction and Design of a container solution for the storage of water pollutants waste water. Design of the tanks double-walled with electronic Leak monitoring, Requirement: SLW 60 Buoyancy control Double-walled High chemical resistance Project Scope: 1 x storage tank 100m³ 1 x storage tank 20 m3 Incl.…

DN 500 transfer line for substances hazardous to water

83646 Wackersberg Construction time: June. 2019 Handover DN 500 stable building to the Slurry pit. Execution according to the new AwSV 2017 and the DWA- TRwS 792 for substances hazardous to water. Requirements: Tensile-welded connection Traffic load: SLW 60 High chemical resistance Special circumstances: Extreme precipitation during the construction time Project Scope: Welding of 14…